Certified piping and
welding crews.
Mobilized across Europe.
Polish industrial subcontractor working with Nordic main contractors on refinery turnarounds, chemical plant shutdowns, large-diameter prefabrication, and heat exchanger overhauls.
[Delivered Via] WP Welding AB · CJ Consulting AB · AK Service UAB · Euro Industries A/S · Scanweld · Emsstahl GmbH · Bilfinger
[01 — Services]
End-to-end piping
and welding capability.
Six integrated capabilities for industrial sites. Single-discipline crews for welding support or full-scope teams for turnarounds and prefabrication campaigns — whichever fits your project structure.
- 01
Industrial Welding
TIG, MIG, and SMAW welding for process piping, pressure equipment, and structural elements. Carbon steel, stainless, duplex, and alloy materials.
[ISO 3834-2][EN 1090-1][EN 1090-2] - 02
Pipeline Installation
Full piping system installation — isometric fit-up, welding, pressure testing, and commissioning support. DN25 through DN2000.
[ISO 3834-2][EN 13480][EN 1090-2] - 03
Pipe Prefabrication
Off-site fabrication of pipe spools and welded assemblies. Reduces site exposure, improves QC, fits tight installation windows. DN25 through DN2000.
[ISO 3834-2][EN 13480][EN 1090-2] - 04
Maintenance & Turnarounds
Planned and emergency shutdown support for refineries, chemical plants, and paper mills. We integrate into existing turnaround programmes and deliver on tight outage windows.
[ISO 3834-2][EN 13480][ISO 45001] - 05
Equipment Installation
Dismantling of obsolete units and installation of new process equipment with associated piping and tie-ins. Performed on operating facilities.
[ISO 3834-2][EN 13480][EN 1090-2] - 06
Heat Exchanger Services
Complete overhaul of shell-and-tube and plate heat exchangers — disassembly, inspection, welding restoration, and reassembly.
[ISO 3834-2][EN 13480][EN ISO 9606-1]
[02 — Selected Work]
Real plants.
Real scope.
Real dates.
Featured campaigns below, ordered by documented scope — refinery turnarounds, large-diameter prefabrication, heat exchanger overhauls.
- 01
Stegra — Large Diameter Pipe Prefabrication for Green Steel
Prefabrication of large-diameter carbon steel pipelines, DN25 through DN2000, for green steel production facility.
[Sweden] [VIA CJ Consulting AB] [4 months] - 02
S.M.I Lorraine — Heat Exchanger Overhaul
Complete repair of industrial heat exchanger including disassembly, inspection, welding restoration works and reassembly.
[France] [VIA CJ Consulting AB] [1 month] - 03
RECION OY — Carbon Steel Pipe Prefabrication
Prefabrication of black steel piping systems of various diameters. Fabrication of pipe spools and welded assemblies for industrial installation.
[Finland] [VIA CJ Consulting AB] [2 months] - 04
WP Welding AB — Multi-Campaign Welding Collaboration
Long-running collaboration with WP Welding AB on multiple Swedish industrial sites. Welding crews embedded for refinery, chemical, and heat-exchanger scopes under WP Welding contracts.
[Sweden] [VIA WP Welding AB] [multi-year]
[07 — Get In Touch]
Need a welding crew
on site?
Tell us your scope, standards, and window. We respond within one business day with team composition, mobilization plan, and next steps.