Chemical plants are among the most unforgiving industrial environments for welding subcontractors. Live sites have residual inventory. Process lines carry corrosive, reactive, or flammable material. Hot work restrictions are strict. Permit-to-work systems are elaborate. And contractor SHE frameworks — like INEOS SHE at INOVYN — explicitly extend the producer’s safety management standards to every person working on behalf of the company.
For a welding contractor, this means operating under a set of rules that are tighter than many industries. Your welders need to be experienced, your documentation needs to be airtight, and your integration with the main contractor and end operator’s safety regime needs to be automatic.
What we deliver
- Chemical plant shutdown support — welding and piping during scheduled outages
- Process equipment replacement — tie-in welding, new unit installation, pressure testing
- Heat exchanger overhaul — complete disassembly, inspection, welding restoration, reassembly
- Piping system welding and installation — stainless, duplex, and alloy materials
- PTW integration and hot work compliance
Standards and codes
ISO 3834-2— welding quality frameworkEN 13480— metallic industrial pipingPED 2014/68/EU— pressure equipment complianceISO 45001— safety management- Client SHE frameworks (INEOS SHE, plant-specific HSE codes)
ASME B31.3— where applicable
SHE framework integration
Chemical producers increasingly require contractors to adopt their own SHE management system — formally and in practice. INEOS SHE at INOVYN is the clearest example: the framework is published, it covers contractors and employees on the same terms, and the producer expects contractor SHE performance to match their own.
Our approach: we adopt the client SHE framework on every chemical job. That means:
- Pre-mobilization SHE induction on client procedures
- Daily toolbox talks with the client or main contractor’s safety lead
- Hot work permits issued under plant procedure with fire watch and exclusion zones
- Incident reporting to plant safety on any near-miss or observation
- Close-out reporting at outage end
Selected projects
INOVYN, Sweden — Chemical plant shutdown
September 2024. Process equipment replacement and piping welding during a live chemical plant outage under the INEOS SHE framework. Delivered via Cj Consulting AB.
S.M.I Lorraine, France — Heat exchanger overhaul
August 2024. Complete industrial heat exchanger repair — disassembly, inspection, welding restoration, reassembly. Delivered via Cj Consulting AB.
Why chemical producers bring MIDAS on
- Real SHE framework experience — INEOS SHE delivered cleanly
- Pressure equipment welding to
ISO 3834-2andPED - Heat exchanger specialist capability
- Nordic main contractor integration — deployment through Cj Consulting AB and partners