[SECTOR L02]

Chemical Plants

Welding, piping, and heat exchanger services for chemical producers operating under contractor SHE frameworks.

[PROJECTS]
2 DELIVERED
[SERVICES]
4 APPLIED

Chemical Plants

The challenge

Chemical plants are among the most unforgiving industrial environments for welding subcontractors. Live sites have residual inventory. Process lines carry corrosive, reactive, or flammable material. Hot work restrictions are strict. Permit-to-work systems are elaborate. And contractor SHE frameworks — like INEOS SHE at INOVYN — explicitly extend the producer’s safety management standards to every person working on behalf of the company.

For a welding contractor, this means operating under a set of rules that are tighter than many industries. Your welders need to be experienced, your documentation needs to be airtight, and your integration with the main contractor and end operator’s safety regime needs to be automatic.

What we deliver

  • Chemical plant shutdown support — welding and piping during scheduled outages
  • Process equipment replacement — tie-in welding, new unit installation, pressure testing
  • Heat exchanger overhaul — complete disassembly, inspection, welding restoration, reassembly
  • Piping system welding and installation — stainless, duplex, and alloy materials
  • PTW integration and hot work compliance

Standards and codes

  • ISO 3834-2 — welding quality framework
  • EN 13480 — metallic industrial piping
  • PED 2014/68/EU — pressure equipment compliance
  • ISO 45001 — safety management
  • Client SHE frameworks (INEOS SHE, plant-specific HSE codes)
  • ASME B31.3 — where applicable

SHE framework integration

Chemical producers increasingly require contractors to adopt their own SHE management system — formally and in practice. INEOS SHE at INOVYN is the clearest example: the framework is published, it covers contractors and employees on the same terms, and the producer expects contractor SHE performance to match their own.

Our approach: we adopt the client SHE framework on every chemical job. That means:

  • Pre-mobilization SHE induction on client procedures
  • Daily toolbox talks with the client or main contractor’s safety lead
  • Hot work permits issued under plant procedure with fire watch and exclusion zones
  • Incident reporting to plant safety on any near-miss or observation
  • Close-out reporting at outage end

Selected projects

INOVYN, Sweden — Chemical plant shutdown

September 2024. Process equipment replacement and piping welding during a live chemical plant outage under the INEOS SHE framework. Delivered via Cj Consulting AB.

Read the full case study

S.M.I Lorraine, France — Heat exchanger overhaul

August 2024. Complete industrial heat exchanger repair — disassembly, inspection, welding restoration, reassembly. Delivered via Cj Consulting AB.

Read the full case study

Why chemical producers bring MIDAS on

  • Real SHE framework experience — INEOS SHE delivered cleanly
  • Pressure equipment welding to ISO 3834-2 and PED
  • Heat exchanger specialist capability
  • Nordic main contractor integration — deployment through Cj Consulting AB and partners

Request a quote

If you operate a chemical facility and need a welding subcontractor with real SHE framework integration experience, send us the scope.

CTA: Request a Quote Secondary: View all industries

ISO 3834-2 EN 13480 PED 2014/68/EU EN ISO 9606-1 ISO 3834-2 EN 13480 PED 2014/68/EU EN ISO 9606-1

Need a welding crew in Chemical Plants?

[REQUEST A QUOTE] →