Steel Production

Large-diameter pipe prefabrication and welding for green steel and traditional steel production facilities.

[PROJECTS]
1 DELIVERED
[SERVICES]
3 APPLIED

Steel Production

The challenge

Steel production facilities — traditional mills and the new wave of green steel plants — need extensive welded piping infrastructure. Large-diameter carbon steel pipelines carry hydrogen, gases, cooling water, and process fluids. Heavy-wall pressure piping connects process islands. Prefabrication output needs to scale across diameters from small-bore instrument and process lines through to DN2000 heavy-section headers.

Greenfield steel projects generate demand faster than most specialist welding contractors can supply. And the new green-steel segment — hydrogen-based direct reduction replacing blast furnaces — is the biggest industrial decarbonisation wave in Europe. These projects are setting the template for the next decade of heavy-industrial welded piping demand.

What we deliver

  • Large-diameter pipe prefabrication — carbon steel from DN25 precision work to DN2000 heavy-section headers
  • Pipe spool fabrication and welded assembly with full traceability
  • Welding to ISO 3834-2, EN 13480, EN 1090
  • Test pack documentation per spool

Standards and codes

  • ISO 3834-2 — comprehensive welding quality
  • EN 13480-4 — metallic industrial piping fabrication and installation
  • EN 1090-2 — structural steel execution
  • EN ISO 15614-1 — welding procedure qualification
  • EN ISO 9606-1 — welder qualification
  • PED 2014/68/EU — pressure equipment where applicable

Diameter and thickness range

  • Diameter: DN25 through DN2000
  • Wall thickness: 2 mm through 60 mm
  • Processes: 141 TIG root, 135 MAG fill/cap, 121 SAW on large-diameter positioner, 111 SMAW

The DN2000 capability is specifically what differentiates us from most small and mid-sized welding subcontractors. Large-bore welding at this scale requires rotating positioners, heavy rigging, and multi-pass welding discipline. We deliver that.

Selected project

Stegra, Sweden — Large diameter pipe prefabrication for green steel

September-December 2025. Four months of carbon steel pipe prefabrication for the Stegra (formerly H2 Green Steel) facility in Northern Sweden — one of Europe’s flagship green steel investments. DN25 through DN2000. Delivered via WP Welding AB.

Read the full case study

Why steel producers and EPC main contractors bring MIDAS on

  • Proven large-diameter capability — DN2000 delivered at Stegra
  • Full range execution — same crew handling DN25 precision and DN2000 heavy work
  • Nordic main contractor partnerships — WP Welding AB
  • Green transition readiness — Stegra is the proof point

Request a quote

If you’re building out a steel production facility — traditional or green — and need a prefabrication subcontractor with proven large-diameter capability, send us the isometric package.

CTA: Request a Quote Secondary: View all industries

ISO 3834-2 EN 13480 PED 2014/68/EU EN ISO 9606-1 ISO 3834-2 EN 13480 PED 2014/68/EU EN ISO 9606-1

Need a welding crew in Steel Production?

[REQUEST A QUOTE] →