Power & Energy
The challenge
Power and energy facilities — combined heat and power plants, district heating stations, industrial boilers, and energy infrastructure — run on the longest asset lifecycles in industry. Plants built decades ago are modernised rather than replaced. New piping is added, existing piping is refurbished, and entire process islands are upgraded while the plant continues to operate around the work.
This means welding contractors in the power sector often deliver long-duration campaigns rather than short outage bursts. The work unfolds over months: new lines installed on existing pipe racks, section by section, each tested and handed over before the next begins. The discipline required is sustained — documentation consistency, welder rotation without quality drift, HSE performance over an extended deployment.
What we deliver
- Pipeline installation on existing racks — new lines integrated into operating plant infrastructure
- Plant modernisation and refurbishment — welding support for process upgrades
- Steam, condensate, and feedwater line installation and repair
- Power piping to
ASME B31.1where project code requires - Pipe prefabrication for power industry applications
Standards and codes
ISO 3834-2— welding quality frameworkEN 13480— metallic industrial pipingASME B31.1— power piping (where applicable)PED 2014/68/EU— pressure equipmentEN ISO 9606-1— welder qualification- Plant-specific HSE codes and PTW procedures
Long campaign execution
Power and energy work is rarely a two-week outage. It’s typically a months-long campaign where the same crew returns week after week, each segment tested and handed over before moving to the next.
Our approach to long campaigns:
- Welder rotation managed to avoid fatigue without losing scope familiarity
- Documentation consistency maintained from week 1 through week 60
- HSE performance sustained across the full duration
- Coordination with main contractor on segment planning, tie-in timing, and pressure test execution
Selected projects
NEURYON, Sweden — Pipeline installation and modernisation
May 2025 – August 2026. Long-duration campaign installing new piping lines on existing pipe racks and modernising operating industrial equipment. Delivered via WP Welding AB.
RECION OY, Finland — Carbon steel pipe prefabrication
June-July 2024. Prefabrication of black steel piping systems for industrial installation — pipe spools and welded assemblies. Delivered via Cj Consulting AB.
Why power & energy operators bring MIDAS on
- Long-campaign execution proven at NEURYON
- Prefabrication for industrial installation proven at RECION OY
- Welding discipline across carbon steel pressure and process piping
- Nordic market presence — Sweden and Finland