FROM | MIDAS Industries sp. z o.o. TO PROCUREMENT
DOC | MID-PQP-2026-01 DATE | 2026-05-16 VER | v1.0
Pre-qualification Pack
Standard prequalification answers for MIDAS Industries. Five consolidated sections — no email exchange required to access. Document pack available on request at the bottom of this page.
[1.0] COMPANY
- [LEGAL ENTITY]
- MIDAS Industries sp. z o.o. (Polish LLC)
- [REGISTERED]
- Świeradowska 47, 02-662 Warsaw, Poland
- [NIP / KRS]
- 5214068819 / 0001103703
- [EU VAT / REGON]
- PL5214068819 / 528564350
- [UBO REGISTER]
- Polish CRBR — compliant, detailed docs on request under NDA
- [INSURANCE]
- General liability + professional indemnity — certificates on request
[2.0] QUALITY FRAMEWORK
- [WELDING]
- ISO 3834-2 (held)
- [STEEL EXEC.]
- EN 1090-1 / EN 1090-2 EXC3 (held)
- [WELDER QUAL.]
- EN ISO 9606-1 (active register)
- [QUALITY]
- ISO 9001:2015 (held)
- [PRESSURE EQ.]
- PED 2014/68/EU (held)
- [COORDINATION]
- EN ISO 14731 — project-specific welding supervisor assigned per scope
- [SEE]
- /certifications/ for full detail
[3.0] COMPLIANCE & SAFETY
- [HSE MS]
- ISO 45001:2018 + ISO 14001:2015 (both held)
- [CLIENT FRAMEWORKS]
- INEOS SHE (delivered)St1 plant HSE (delivered)Arctic Paper site HSE (delivered)
- [PROCEDURES]
- Permit-to-workHot work / fire watchConfined space entryWorking at heightIncident reporting
- [ESG / CSDDD]
- EU directive aware — disclosure framework in preparation
- [UNGP]
- Aligned with UN Guiding Principles on Business and Human Rights
- [SANCTIONS]
- OFAC · EU Consolidated · UK — all clear, updated screen on request
- [LABOUR]
- Direct EU employees — no undeclared subcontracting
- [SEE]
- /hseq/ for full detail
[4.0] REFERENCES
- [MAIN CONTRACTOR PARTNERS]
- WP Welding AB (SE) — refinery turnaround + large-diameter prefabCJ Consulting AB (SE) — chemical plants, heat exchanger, intl. workAK Service UAB (LT) — paper mill + industrial maintenance
- [PROJECTS]
- 15 delivered since 2022 — see /projects/
- [REFERENCE CONTACTS]
- Named procurement contacts at WP Welding AB, CJ Consulting AB, and AK Service UAB — available on request to qualified procurement teams under mutual NDA.
- [END OPERATORS]
- Stegra (H2 Green Steel)Arctic PaperSt1 RefineryINOVYNRECION OYS.M.I LorraineGävle PortNEURYON
[5.0] GOVERNANCE
- [WHISTLEBLOWING]
- ethics@midas-industries.eu
- [LEGAL BASIS]
- EU Whistleblower Protection Directive (2019/1937)
- [ANTI-CORRUPTION]
- Internal policy aligned with OFAC / EU / UK regs
[6.0] MOBILIZATION TIMELINE
15 working days · PO → crew on site
From signed PO to first weld on your site, in three phased blocks. Posted-worker compliance, welder qualification verification, and mobilization logistics — sequential timeline, parallelized where safe.
- P1 D0 → D3
Compliance
- A1 issued through ZUS — every welder, before mobilization.
- Host-country posting notifications filed: ISA (SE) · LIE (FI) · Meldepflicht (DE) · Limosa (BE) · SIPSI (FR) · RUT (DK) · TÖÖ (EE).
- Site induction packs prepared (ID06 · VCA · Työturva · BTP).
- P2 D3 → D10
Qualification
- Welder qualifications verified against client WPS coverage (~140 active WPS).
- New WPQR if scope outside coverage: test coupon → NDT → mechanical → notified-body report.
- Coordinator briefing against project specs · isometric pack reviewed.
- P3 D10 → D15
Mobilization
- Travel chartered: bus or commercial flight Warsaw → site (typical <6 h door-to-door in Nordics).
- Accommodation booked — 3★ hotel for >2-week stays, serviced apartments for long rotations.
- Welding equipment trucked or container-shipped — ESAB / Lincoln machines, grinders, PAPR.
D15 · ON SITE
Crew reports to your project organization. Welding supervisor joins your turnaround / project meetings. First permit-to-work issued. Welding starts.
DOCUMENT DOWNLOADS
- D01 Capability Statement (PDF) [PENDING]
- D02 ISO 3834-2 Certificate (PDF) [PENDING]
- D03 EN 1090 Certificate (PDF) [PENDING]
- D04 ISO 9001 Certificate (PDF) [PENDING]
- D05 ISO 14001 Certificate (PDF) [PENDING]
- D06 ISO 45001 Certificate (PDF) [PENDING]
- D07 PED Certificate (PDF) [PENDING]
- D08 HSE Policy (PDF) [PENDING]
- D09 Quality Policy (PDF) [PENDING]
[PRIMARY ACTION]
Get the prequalification pack.
One ZIP archive containing all documents above. Forward directly to your line of business — no follow-up required.
MID-PQP-2026-01 ARTIFACT PROCUREMENT-READY EU-COMPLIANT MID-PQP-2026-01 ARTIFACT PROCUREMENT-READY EU-COMPLIANT