FROM  |  MIDAS Industries sp. z o.o. TO PROCUREMENT
DOC  |  MID-PQP-2026-01 DATE  |  2026-05-16 VER  |  v1.0

Pre-qualification Pack

Standard prequalification answers for MIDAS Industries. Five consolidated sections — no email exchange required to access. Document pack available on request at the bottom of this page.

[1.0] COMPANY

[LEGAL ENTITY]
MIDAS Industries sp. z o.o. (Polish LLC)
[REGISTERED]
Świeradowska 47, 02-662 Warsaw, Poland
[NIP / KRS]
5214068819 / 0001103703
[EU VAT / REGON]
PL5214068819 / 528564350
[UBO REGISTER]
Polish CRBR — compliant, detailed docs on request under NDA
[INSURANCE]
General liability + professional indemnity — certificates on request

[2.0] QUALITY FRAMEWORK

[WELDING]
ISO 3834-2 (held)
[STEEL EXEC.]
EN 1090-1 / EN 1090-2 EXC3 (held)
[WELDER QUAL.]
EN ISO 9606-1 (active register)
[QUALITY]
ISO 9001:2015 (held)
[PRESSURE EQ.]
PED 2014/68/EU (held)
[COORDINATION]
EN ISO 14731 — project-specific welding supervisor assigned per scope
[SEE]
/certifications/ for full detail

[3.0] COMPLIANCE & SAFETY

[HSE MS]
ISO 45001:2018 + ISO 14001:2015 (both held)
[CLIENT FRAMEWORKS]
INEOS SHE (delivered)St1 plant HSE (delivered)Arctic Paper site HSE (delivered)
[PROCEDURES]
Permit-to-workHot work / fire watchConfined space entryWorking at heightIncident reporting
[ESG / CSDDD]
EU directive aware — disclosure framework in preparation
[UNGP]
Aligned with UN Guiding Principles on Business and Human Rights
[SANCTIONS]
OFAC · EU Consolidated · UK — all clear, updated screen on request
[LABOUR]
Direct EU employees — no undeclared subcontracting
[SEE]
/hseq/ for full detail

[4.0] REFERENCES

[MAIN CONTRACTOR PARTNERS]
WP Welding AB (SE) — refinery turnaround + large-diameter prefabCJ Consulting AB (SE) — chemical plants, heat exchanger, intl. workAK Service UAB (LT) — paper mill + industrial maintenance
[PROJECTS]
15 delivered since 2022 — see /projects/
[REFERENCE CONTACTS]
Named procurement contacts at WP Welding AB, CJ Consulting AB, and AK Service UAB — available on request to qualified procurement teams under mutual NDA.
[END OPERATORS]
Stegra (H2 Green Steel)Arctic PaperSt1 RefineryINOVYNRECION OYS.M.I LorraineGävle PortNEURYON

[5.0] GOVERNANCE

[WHISTLEBLOWING]
ethics@midas-industries.eu
[LEGAL BASIS]
EU Whistleblower Protection Directive (2019/1937)
[ANTI-CORRUPTION]
Internal policy aligned with OFAC / EU / UK regs

[6.0] MOBILIZATION TIMELINE

15 working days · PO → crew on site

From signed PO to first weld on your site, in three phased blocks. Posted-worker compliance, welder qualification verification, and mobilization logistics — sequential timeline, parallelized where safe.

  1. P1 D0 → D3

    Compliance

    • A1 issued through ZUS — every welder, before mobilization.
    • Host-country posting notifications filed: ISA (SE) · LIE (FI) · Meldepflicht (DE) · Limosa (BE) · SIPSI (FR) · RUT (DK) · TÖÖ (EE).
    • Site induction packs prepared (ID06 · VCA · Työturva · BTP).

    2–3 working days · in parallel.

  2. P2 D3 → D10

    Qualification

    • Welder qualifications verified against client WPS coverage (~140 active WPS).
    • New WPQR if scope outside coverage: test coupon → NDT → mechanical → notified-body report.
    • Coordinator briefing against project specs · isometric pack reviewed.

    1–2 working weeks · faster if WPS already covers scope.

  3. P3 D10 → D15

    Mobilization

    • Travel chartered: bus or commercial flight Warsaw → site (typical <6 h door-to-door in Nordics).
    • Accommodation booked — 3★ hotel for >2-week stays, serviced apartments for long rotations.
    • Welding equipment trucked or container-shipped — ESAB / Lincoln machines, grinders, PAPR.

    1 working week.

D15 · ON SITE

Crew reports to your project organization. Welding supervisor joins your turnaround / project meetings. First permit-to-work issued. Welding starts.

DOCUMENT DOWNLOADS

  • D01 Capability Statement (PDF) [PENDING]
  • D02 ISO 3834-2 Certificate (PDF) [PENDING]
  • D03 EN 1090 Certificate (PDF) [PENDING]
  • D04 ISO 9001 Certificate (PDF) [PENDING]
  • D05 ISO 14001 Certificate (PDF) [PENDING]
  • D06 ISO 45001 Certificate (PDF) [PENDING]
  • D07 PED Certificate (PDF) [PENDING]
  • D08 HSE Policy (PDF) [PENDING]
  • D09 Quality Policy (PDF) [PENDING]

[PRIMARY ACTION]

Get the prequalification pack.

One ZIP archive containing all documents above. Forward directly to your line of business — no follow-up required.

MID-PQP-2026-01 ARTIFACT PROCUREMENT-READY EU-COMPLIANT MID-PQP-2026-01 ARTIFACT PROCUREMENT-READY EU-COMPLIANT