Real plants. Real scope. Real dates.

Nine delivered industrial projects across Sweden, Finland, and France between June 2024 and December 2025. Every project below is named, dated, and scoped.

[COUNT]
7 DELIVERED
[PERIOD]
2024-06 — 2025-12
[COUNTRIES]
SE · FI · FR
[PARTNERS]
WP · CJ · AK
P01
[OIL · REFINERIES] [Sweden]

St1 Refinery — Three-Phase Turnaround Campaign

Three consecutive turnaround campaigns across refinery shutdown windows — furnace repair, welding, piping installation, and new process equipment installation.

[PERIOD] Nov 2024 — Apr 2025 [VIA] WP Welding AB [DURATION] 5 months (3 campaigns)
P02
[STEEL · PRODUCTION] [Sweden]

Stegra — Large Diameter Pipe Prefabrication for Green Steel

Prefabrication of large-diameter carbon steel pipelines, DN25 through DN2000, for green steel production facility.

[PERIOD] Sept 2025 — Dec 2025 [VIA] WP Welding AB [DURATION] 4 months
P03
[CHEMICAL · PLANTS] [Sweden]

INOVYN — Chemical Plant Shutdown Support

Shutdown maintenance at chemical facility — replacement of process equipment and welding / installation of piping systems.

[PERIOD] Sept 2024 — Sept 2024 [VIA] Cj Consulting AB [DURATION] 1 month
P04
[PULP · AND-PAPER] [Sweden]

Arctic Paper — Mill Equipment Replacement

Dismantling of obsolete equipment and installation of new units at operating paper mill facility.

[PERIOD] Jun 2025 — Jul 2025 [VIA] AK Serisė UAB [DURATION] 2 months
P05
[POWER · ENERGY] [Sweden]

NEURYON — Pipeline Installation & Modernisation

Installation of new piping lines on existing pipe racks. Modernisation and partial refurbishment of operating industrial equipment.

[PERIOD] May 2025 — Aug 2026 [VIA] WP Welding AB [DURATION] Long-term campaign
P06
[POWER · ENERGY] [Finland]

RECION OY — Carbon Steel Pipe Prefabrication

Prefabrication of black steel piping systems of various diameters. Fabrication of pipe spools and welded assemblies for industrial installation.

[PERIOD] Jun 2024 — Jul 2024 [VIA] Cj Consulting AB [DURATION] 2 months
P07
[CHEMICAL · PLANTS] [France]

S.M.I Lorraine — Heat Exchanger Overhaul

Complete repair of industrial heat exchanger including disassembly, inspection, welding restoration works and reassembly.

[PERIOD] Aug 2024 — Aug 2024 [VIA] Cj Consulting AB [DURATION] 1 month
St1 Refinery INOVYN Stegra · H2 Green Steel Arctic Paper NEURYON RECION OY S.M.I Lorraine St1 Refinery INOVYN Stegra · H2 Green Steel Arctic Paper NEURYON RECION OY S.M.I Lorraine

[GET STARTED]

Have a similar project?

Tell us the scope and we'll tell you if we can deliver it. One business day response.

[REQUEST A QUOTE] →