[COUNTRY · SE]

Sweden

Active project track record in Sweden since 2022 — refinery turnarounds, green-steel large-diameter prefabrication, paper mill shutdowns. Crews mobilized via Nordic main contractors.

[STATUS]
ACTIVE
[PROJECTS]
10 DELIVERED

[POSTING & COMPLIANCE STACK]

[]
[]
[]
[]
[]

[DOCUMENTS WE PROVIDE BEFORE MOBILIZATION]

  • 01 Polish certificate of incorporation (KRS)
  • 02 A1 PD per posted worker
  • 03 EN ISO 9606-1 welder qualification cards
  • 04 WPS / WPQR per process
  • 05 ID06 photo-ID issued
  • 06 F-skatt confirmation (when applicable)

Why this matters

Procurement in Sweden screens out subcontractors on three things before reading the rate sheet: ID06 readiness, posting notification compliance, and CBA alignment. Each is binary — either you have it before the welders cross the border, or the site supervisor sends the team back.

We treat all three as standing capability, not per-mobilization scramble.

Active project references

  • Stegra (H2 Green Steel, Boden) — DN25–DN2000 carbon steel prefabrication, Sept–Dec 2025. Delivered via CJ Consulting AB.
  • St1 Refinery (Gothenburg) — three back-to-back turnarounds, Nov 2024 – Apr 2025. Delivered via WP Welding AB.
  • Arctic Paper (Munkedal) — paper mill shutdown campaign, 2024. Delivered via CJ Consulting AB.
  • INOVYN — chemical shutdown campaign, Sept 2024. Delivered via CJ Consulting AB.
  • NEURYON — long-running process-piping campaign, 2025–2026.
  • Gävle Port — harbour trestle welding and black-steel piping prefab.
  • Sweden pulp mill — embedded piping and welding campaign via Bilfinger.
  • Sweden stainless prefab — multi-week stainless piping prefab campaign.
  • Sweden heat exchanger — short-term overhaul at an undisclosed Swedish process plant.
  • WP Welding multi-campaign — long-standing rolling welding scope across Swedish industrial sites since 2022.

Main-contractor partnerships

  • WP Welding AB — refinery and steel
  • CJ Consulting AB — pulp & paper
  • AK Service UAB — cross-Baltic mobilization

Browse all Swedish projects →

[NOTE] Lead time from inquiry to first day on site depends on customer prequalification cycle and ID06 backlog; we plan around the customer's outage window.

ISO 3834-2 EN 1090-2 EN ISO 9606-1 PED 2014/68/EU ISO 3834-2 EN 1090-2 EN ISO 9606-1 PED 2014/68/EU

Need a posting-compliant crew in Sweden?

[REQUEST A QUOTE] →